Projects

So far, we have conducted a number of assembly projects both domestically and abroad. We have selected the following projects to demonstrate our capacities:

1. Laktopol Dairy Plant

1. modernization of the powdering system,
2. assembly of technological systems for the processing department,
3. CIP station assembly,
4. construction of supporting structures for machinery and equipment used in butter production.

3. Coca – Cola HBC Polska

1. execution of water and carbon filter sterilizing installation,
2. connection of water installation for reverse osmosis filters,
3. modernization of the CIP installation,
4. compressed air installation for blow molding,
5. execution of installation for measuring chlorine levels in water,
6. execution and assembly of a 20 000 l water tank,
7. execution and assembly of technological heating installation and insulation,
8. execution of 25000 l lye vessel insulation.
9. execution of glycol and ice water insulation,
10. execution of the following production line installations: lye installation, production water installation, softened water, syrup, CIP supply and return, CO2, softened water, chlorinated water (continuous operation since the inception of the company)
11. assembly of ice water installation with DN 150 and DN 200 insulation.
12. assembly of technological installations (water, CIP, compressed air) for the new KRONES bottling line.

5. APV Invensys Systems

1. execution of pasteurization sets,
2. pasteurizer assembly for the following plants: LAKTOPOL, CHEESE ICC, Coral,
3. technological systems assembly for new MLEKPOL cheese factory - Grajewo in Mrągowo
4. syrup station assembly for Coca Cola
5. flavored water installation assembly for Danone.

7. Gillette Polska

1. condensed air installation,
2. production water installation,
3. air compressors piping execution and assembly,

9. O. K. Fruit Concentrates

1. welding of apple juice vessels,
2. CIP installation assembly,
3. connection of media to the evaporation station,
4. execution of finished product installation.

11. Van Pur Brewery

1. assembly of mash tun together with insulation,
2. assembly of mash tun installation,
3. boiling vessel assembly,
4. construction and assembly of glycol installation for fermentation tanks together with polyurethane foam insulation,
5. construction and assembly of glycol installation for refrigeration units together with polyurethane foam insulation,
6. construction and assembly of 100 000 l hot water tank together with heat-insulation,
7. CIP station assembly,
8. MEURA mash filter assembly with piping
9. insulation for fermentation tank system,
10. technological installation execution for the Zabrze brewery.

13. R.S.M. Rolmlecz

1. assembly of process installation in the butter production department,
2. assembly of UHT and normalization department installation,
3. assembly of a double-track CIP station,
4. execution and assembly of registration systems for the CIP station,
5. assembly of chemistry dosing pumps,
6. construction and assembly of the milk receipt system.

15. Extur

1. execution of the concentrate vessels installation,
2. connection of media to the BUCHER ultra-filtration station,
3. connection of the BUCHER presses.

17. Spomlek

1. execution and assembly of ice water installation,
2. connection of milk centrifuges,
3. technological installation of the packaging equipment,
4. modernization of a number of technological installations at the plant.

19. Sery ICC Pasłęk

1. execution and assembly of nanofiltration system,
2. assembly of the powdering system process installation,
3. assembly of the process installation for the cheese manufacturing plant,
4. execution of automatic technological systems controls.

21. Kraft Foods

1. modernization of production installations at the production plant in Cieszyn,
2. execution and assembly of double-walled pipeline for chocolate at the production plants in Jankowice and Cieszyn,
3. pneumatic flour transmission installation assembly.

23. GlaxoSmithKline

1. execution and assembly of clean water installation,
2. execution and assembly of softened water installation.

25. Getynga

1. execution and assembly of clean water installation.

27. Wawel Kraków

1. execution and assembly of pipeline supporting structures,
2. prefabrication of chocolate installation,
3. assembly of chocolate installation with coolant jacket (double-walled pipes),
4. disassembly, renovation and reassembly of the mogul line for the production of jelly.

29. Łuków Dairy Plant

1. modernization of all existing installations at the plant,

31. GEA P.T.

1. assembly of technological installations at O.S.M. Koło,
2. assembly of numerous technological installations for yogurt and cream production at the Zott plant.

33. BWT – Best Water Technology

1. prefabrication and assembly of technological installation for the water filter station,
2. assembly of water installation for the osmosis filter at the LG – Philips Kobierzyce plant.
3. water installation assembly for the Pątnów power plant,
4. assembly of reverse osmosis installation for L'Oreal.

35. Heineken – Grupa Żywiec S.A.

1. installation assembly for carbon filters at the brewery in Żywiec.

37. Biomed

1. execution and assembly of a complete clean water installation.

39. Obram

1. assembly of cheese installation for O.S.M. Zambrów,
2. assembly of curd installation at the Dubna dairy plant – Ukraine,
3. assembly of cheese installation at the Tołoczyn dairy plant – Belarus.

41. Guthe De.

1. assembly of a complete set of pharmaceutical installations for the GAMBRO GmbH company in Opelika – USA.

43. GEA Tu

1. participation in assembly of fermentation tanks for the SAB Miller brewery in Tychy
2. assembly of, among others: CIP, acid installations, beer installation,
3. valve terminal assembly (valve assemblies)
4. assembly of complete production installations for a system of 18 fermentation tanks, CIP station,
5. propagation of yeast in the OKOCIM brewery - Carlsberg group,
6. technological modernization of installations in the existing system of 8 fermentation tanks associated with the new technology of beer production.

45. Wella D

1. execution and assembly of product mixing installation,
2. assembly of process installation for storage tanks – 14 pcs.
3. osmosis station assembly,
4. execution of osmatic water installation.

47. Müller

1. assembly of the product osmosis station.

49. Wella F.

1. assembly of storage tanks together with execution and connecting of technological installation
2. construction and assembly of emptying station for 1000 l transport tanks

51. Procter&Gamble

1. execution of technological installation for mixing hair dye,
2. assembly of process installation for external product storage.

53. Adelholzener

1. syrup station expansion,
2. water buffering station expansion, 53.3. finished product station expansion.

55. Lech Brewery – SAB Miller Group

1. cleaning installation assembly,
2. execution of sugar syrup installation.

2. Herbapol

1. execution and assembly of purified water installation.

4. KHS Maschinen und Anlagenbau

1. construction and assembly of the air system for bottle dryers
2. connecting of the milk distribution installation (CIP, milk, air)
3. construction and assembly of the palletizer service platform,
4. mechanical and electrical assembly of the palletizer.

6. Tymbark S. A. – Maspex group

1. modernization of installations at the production plant in Tymbark,
2. execution of piping installation for the CIP station,
3. technological. installation for the new PROCOMAC bottling line.

8. Stangl

1. construction of the new ECE shopping mall in Kraków – internal technical installations,
2. construction of warehouses for KAUFLAND,
3. participation in the assembly of piping installation at a rubber factory in Skalbimierz,
4. technological assembly of heat installation at the Cadbury chocolate factory.
5. assembly of the sewage system,
6. assembly of the ventilation system.

10. Appol

1. evaporation station installations,
2. steam and condensate installations,
3. product installation,
4. media for the ultra-filtration station.

12. O. S. M. Końskie

1. CIP station execution and assembly,
2. execution and assembly of a cream cooler,
3. washing and heating installation for fermentation tanks,
4. milk, cream and intermediate tank washing installations,
5. milk receipt installation.

14. Polpharma

1. oil heating - cooling oil installation for reactor blankets at a pilot plant division.

16. Milford – Schwarte

1. processing vessels assembly and welding.

18. Alfa Laval

1. execution of plate-washing tank,
2. execution of egg yolk pasteurizer.

20. Pepsi – Cola Polska

1. modernization of the CO² installation,
2. modernization of the syrup installation,
3. execution and assembly of production line switch panels.

22. Turek Sp. z o.o. Dairy Plant

1. modernization of dairy installation of the milk processing room,
2. modernization of intermediate tank installations.

24. Frankfurt Clinic

1. execution and assembly of clean water installation (with the use of an automatic welding unit).

26. Masterfoods

1. prefabrication and assembly of pneumatic peanut transmission installation.

28. Carlsberg Polska S.A. Okocim Brewery

1. execution and connection of the UV lamps,
2. filter assembly,
3. prefabrication and assembly of water transmission installation for the CIP station,
4. assembly of production installation and washing installation for fermentation tanks and the water tank.

30. Royal Unibrew Polska Sp. z o.o.

1. execution of technological installation for water buffer tanks
2. connecting pumps to the fittings,
3. assembly of sugar syrup installation for the brew hose,

32. Moeschle Polska Sp. z o.o.

1. processing tanks assembly and welding,
2. prefabrication, assembly and welding of technological lines (CIP, filling, emptying, release) for a system of storage tanks – 27 pcs.

34. Agrana Fruit

1. preparation and assembly of technological installation for a system of juice storage vessels
2. – 50 pcs.,
3. disassembly of the aroma station in Carei – Romania,
4. disassembly of part of the production hall for the purpose of disassembling 20 pcs. of product vessels,
5. assembly of the aroma station at the Gołębiów plant.

36. ICN

1. execution and assembly of sterile condensed process air installation,
2. execution and assembly of condensed technical air installation.

38. Florena DE

1. execution and assembly of a three-track CIP station,
2. steam installation assembly,
3. condensate installation assembly.

40. Stute

1. assembly of all process installations for two KHS PET type bottling lines,
2. assembly of all process installations for KHS can filling production line – 1 pc.

42. O.S.M. Garwolin

1. modernization of the cheese production installation.

44. Turek Dairy Plant – Bongrain Groupe

1. execution and assembly of technological installation used in production of cheese,
2. execution of water installation,
3. CIP station assembly,
4. execution of a number production installations used in production of dairy products.

46. FoodCare

1. mechanical assembly of the KHS can filling production line for TIGER brand energy drinks,
2. assembly of the KHS bottling line for TIGER brand energy drinks in PET-type bottles,
3. construction and assembly of bottling line service platforms,
4. assembly of the following installations: condensed air, steam and condensate, syrup, water, insulation.

48. Gludan

1. execution and assembly of process installation for the production of glue.

50. Rotkäppchen Sektkelerei

1. assembly of process installation for the production of champagne,
2. assembly of process installation for the production of wine,
3. compressed air installation assembly,
4. water installation execution,
5. CO2 installation execution.
6. connection of the PALL specialist filtration station,
7. execution of process installation for the storage of the finished product – connecting 108 storage tanks.

52. Sulimar Brewery

1. assembly of KEG beer production installation,
2. assembly of beer installation,
3. assembly of water installation, (cold, hot, heat exchangers),
4. assembly of yeast installation,
5. assembly of CIP installation,
6. assembly of CO2 and air installation,
7. execution of switch panels – 25 pcs.
8. execution and assembly of a complete CIP station,
9. assembly of the KHS can filling production line for energy drinks,
10. assembly of the MEURA mash filter and installation - 1 set,
11. execution and assembly of pump set with fittings - 1 set
12. beer filtering station assembly.
13. assembly of the full installation set for fermentation tanks – 24 pcs.

54. Cargill

1. execution and assembly of a number of chocolate manufacturing installation,
2. heating installation assembly,
3. execution of the supporting structures.